BACK to ORNAMENTAL SHEET METAL FABRICATION
Steeple Tower Restoration Memorial Hall, Harvard University
Cambridge, Massachusetts
Reproduction of Copper Cornice, Copper Weathervanes, Copper Ridge Cresting and Dormers
Since a devastating fire in 1956 this slate and copper spire had been missing from the top of the masonry structure. Heather & Little, were contracted to re-produce, replicate, and supply all of the decorative copper elements, that had originally adorned the tower as seen in the photo of the completed Tower
Click on images below to view at larger size.
|
The Crown is craned into place |
This lift required one of the largest cranes in Boston |
|
Crowned cresting being craned to the top |
COMPLETED JUST IN TIME FOR THE MILENIUM |